Welcome!
Brand Name | CZ Gear | Material | Steel | Model Number | Drawings |
---|---|---|---|---|---|
Place of Origin | Guangdong, China |
OEM&ODM Elevator Parts-Pinion Gear,Planetary Gear
? | PRODUCT INFORMATION |
Brand | ?CZ Gear |
Shape | ?Shown as photo |
Direction | ?Shown as photo |
Material | ?Steel |
Processing | ?Depend on customer's requiry |
Pressure Angle | ?Depend on customer's requiry |
Place of Origin | ?PRC |
Model Number | ?According to drawing |
Brand Name | ?CZ Gear |
Standard or Nonstandard | ?Nonstandard |
Stardard | ?ISO 6 |
? | PRODUCTS DISPLAY |
? | PRODUCT ADVANTAGE |
? | APPLICATION RANGE |
? | COMPANY OVERVIEW |
? | WORKSHOP? |
? ? Company IN 1998 TO 2004
|
? ? Company IN 2004 TO 2009
|
? ? Company IN 2009 TO 2016
|
? ? MACHINES AND WORK SHOP
|
? | EXHIBITION & CUSTOMER |
? | CREDIBILITY |
? | CONTACT US |
Tell | ?+86-0757-85685041 85682670 |
Fax | ?+86-0757-85685979 |
Web1 | ? |
Web2 | ?http://czgear.en.china.cn/ |
Add | Xiaotang SanHuan Xi Industrial Zone ,Shishan , Nanhai , Foshan , GD Province , China |
? | FAQ |
1. Are you the manufacturer or trading company? ? ? We are a professional manufacturer of gear transmission, committing to pr- ovide customers with ? ? quality, flexible, professional custom services. |
2. What is your main market? ? ? Our main market Europe (Italy, Germany, and France), Canada, USA, etc. |
3. How to get a quotation? ? ? Please send us drawings in igs, dwg, step etc. together with detailed PDF.If you have any ? ? requirements, please note, and we could provide professional advice for your reference. |
4. What if we do not have drawing? ? ? Samples would be available, and we would send you drawing to confirm. Of course, we would ? ? ensure the safety of the drawing. |
5. How to pay? ? ? For most orders, T/T is preferred. |
6. How to ship? ? ? For small quantity, we have cooperation with TNT, FEDEX, UPS, DHL etc. For big quantity, air or ? ? sea would be available for you to choose. |
7. What about the packing details? ? ? We attached our normal packing details.If you have any special requirements, we would be willing ? ? to help. |
8. What about the delivery time? ? ? It would be 30-45 days normally for the parts to be ready and we had a sy- stem to ? ? ensure the time.When you made your order, you would know. |
BACK TO HOME PAGE > |
Contact Us
Foshan Chengzhi Gear Work